Profil Wakil Gubernur

N A M A                                               :   ANDI SUDIRMAN SULAIMAN, ST 

TEMPAT DAN TANGGAL LAHIR       :   KABUPATEN BONE, 25 SEPTEMBER 1983

NAMA ISTRI                                       :   NAOEMI OCTARINA

ANAK                                                  :   (3 ORANG)

AGAMA                                               :   ISLAM

PEKERJAAN                                       :   WAKIL GUBERNUR SULAWESI SELATAN

 

RIWAYAT PENDIDIKAN

1989 – 1995 SD Inpress 10 73 Mappesangka, Bone – Sulawesi Selatan

1995 – 1998 SLTP Negeri 1 (Ujung Lamuru) Lappariaja, Bone – Sulawesi Selatan

1998 – 2001 SMU Negeri 1 Watampone, Bone – Sulawesi Selatan

2001 – 2005 S1 Teknik Mesin Universitas Hasanuddin, Makassar – Sulawesi Selatan

2. Riwayat Organisasi

1994 – Ketua Bina Damping Putra Pramuka SLTP Negeri 1 Lappariaja, Bone – Sulawesi Selatan

2000 – Ketua Terpilih Dewan Ambalan Putra Pramuka SMA Negeri 1 Watampone, Bone – Sulawesi Selatan

2000 – Ketua Terpilih OSIS SMA Negeri 1 Watampone, Bone – Sulawesi Selatan

2000 – Ketua Terpilih MPK SMA Negeri 1 Watampone, Bone – Sulawesi Selatan

2000 – Pendiri Organisasi Rohani Islam (ROHIS) SMA Negeri 1 Watampone, Bone – Sulawesi Selatan

2000 – Pendiri Organisasi Siswa Pecinta Alam (Respon – Sispala) Watampone, Bone

2002 – Pendiri Forum Pemuda Pelajar Mahasiswa (FPM) Mappatunru, Bone – Sulawesi Selatan

3. Prestasi/ Training/ Sertifikat

2005 – Nominasi Dikti RI 2005 Lomba PKMT “Perancang Pembangkit Listrik Tenaga Arus Laut”

2005 – Lulusan Tercepat Teknik Mesin Angkatan 2001

2009 – Employee of The Year (Karyawan Terbaik) – PT Marine Engineering Services (Perusahaan Inggris)

2002 – HMM UNHAS AutoCAD 2000 Program 2D & 3D

2004 – Thiess Indonesia Undergraduate Scholarship Program (Beasiswa Perusahaan Australia)

2005 – Thiess Indonesia Management System (Graduate Development Program)

2006 – Thiess & ConocoPhillips Leadership I & II

2006 – Thiess & ConocoPhillips Safety and Environment

2007 – EDP Media Resources Management – Primavera 6 Course

2007 – Thiess Indonesia Business English Course

2008 – Petrosea PRISM Training I (Costing & Scheduling)

2009 – Marine Engineering Services Business English Course I

2009 – Petrosea Integrated Project Management Training

2010 – Marine Engineering Services Business English Course II

2010 – Persatuan Insinyur Indonesia (PII)

2012 – LPJK Sertifikat Ahli Utama

ISO 9001:2008, OHSAS 18001: 2007, and ISO14001:2004

4. Kemampuan Bahasa

Language Speaking Writing Reading

Indonesian: Excellent Excellent Excellent

English: Good Good Good

5. Pengalaman Kerja:

Date: 2013 – 2017

Employer: PT Offshore Services Indonesia/ MES (British)

Position held: Project Manager

Project Involved:

$40MM Contact Value – PHE ONWJ STC-0942 2nd Campaign (2017)

Technical Services for Subsea Inspection, Maintenance & Repair (IMR) Campaign 2016 – 2018 (STC 0942)

8” YA-B1C Riser & Pipeline Sectional Replacement

CP System retrofit

Pipeline Leaks Survey & rectifications

$40MM Contact Value – PHE ONWJ STC-0942 1st Campaign (2016)

 

Technical Services for Subsea Inspection, Maintenance & Repair (IMR) Campaign 2016 – 2019 (STC 0942)

24” APNA-MMC Pipeline Hot tap, Stopple & Spool Installation

SPM#3 Subsea hose, valve and MWB replacement

8” FWA-FWB Riser & Subsea Pipeline Sectional Replacement

CP System retrofit

Pipeline Leaks Survey & rectifications

ConocoPhillips Indonesia (2014)

Provision of DP II DSV Crest Odyssey 1 complete with Saturation / ROV spread for

KERISI/HIU Project, SOW : Hiu Electrical fault finding & repair and Hiu A01 SCM Change out

BELIDA Project : Belida Subsea Wells plug and abandonment preparation works (3 wells)

$10MM Contact Value PHE ONWJ STC-0885 2nd Campaign (2014)

CP System Retro Fit – Anode Pod Installation Scour

Mattrass Installation

ZUD Sectional riser replacement

LC-LPRO Sectional replacement

$10MM Contact Value PHE ONWJ STC-0885 1st Campaign (2013)

CP System Retro Fit – Anode Pod Installation Scour

Mattrass Installation

SPM#4 Subsea hose replacement

Date: 2010 – 2014

Employer: PT Marine Engineering Services (British)

Position held: Engineering Project Coordinator

Project Involved:

ConocoPhillips EHMR EPCI Project (2012-2013)

MES was subcontractor to undertake the detailed engineering.

Rigid riser Installation

Flexible flowline Installation

PLEM Installation

PHE ONWJ STC-0732 Installation Engineering (2012-2014)

MES was contractor to undertake the installation engineering.

SPM Subsea hose replacement

Subsea pipeline & riser sectional replacement

Subsea pipeline hot tap

Sat & Air Diving work package

CP retrofit

Power cable installation

Boat landing repair

Etc

PHE ONWJ STC-0542 Installation Engineering (2010-2012)

MES was contractor to undertake the installation engineering.

SPM Subsea hose replacement

Subsea pipeline & riser sectional replacement

Subsea pipeline hot tap

Sat & Air Diving work package

CP retrofit

Power cable installation

Boat landing repair

Etc

Date: June 2009

Employer: PT Marine Engineering Services (British)

Position held: Lead Project Services

Project Involved:

ConocoPhillips – Tembang FEL Engineering Services

ConocoPhillips – Bawal FEL 3 Define Phase Engineering Service

ConocoPhillips – 28″ Pipeline – Pemping Subsea Tie-in B (SSTI-B) Development Project (Bid)

Santos – Maleo Peluang Study (Bid)

Date: 2008 – 2009

Employer: PT PETROSEA TBK (Asutralia)

Position held: Project Controls Engineer

Project Involved:

ADARO Wash Plant

Banpu Indominco – 3842C – Bontang Coal Terminal Project Upgrade

$80MM Contract Value – Ilham Habibie Bara Utama Pakar Coal Project

Date: 2008

Employer: PT PETROSEA TBK (Asutralia)

Position held: Acting – Construction Manager/ Sr. Field Project Controls Engineer

Project Involved:

Cibaliung Sumber Daya (CSD) – Cibaliung Phase 2 Gold Project

Date: 2007 – 2008

Employer: PT THIESS CONTRACTOR (Australia)

Position held: Project Controls Engineer/ Estimating

Project Involved :

2x150MW Muba Power Station Project (MUBA Project) – bid

Tabang Coal Upgrade (TCUP) Project – bid

Tanjung Priok Terminal Project (400,000M3 Tank Capacity)– bid

40 Floors of Ratu Prabu 3 Residence – Bid

Date: 2005 – 2007

Employer: PT THIESS CONTRACTOR (Australia)

Position held: Project Controls Engineer

Project Involved

Register For Vote